Fulfillment of the founders’ requirement to install a domestic UserGate E1000 firewall at the network perimeter.
Question
• Review of the client’s current network infrastructure. Identification of internal services that require external access
• Development and approval of a new network diagram with the client
• Performance of commissioning works in accordance with the previously approved diagram, ensuring access to the required services and configuration of related equipment (switches)
• Assessment of the existing electrical network’s capacity for connecting the equipment in accordance with the requirements
Solution
• Commissioning of the devices in accordance with the diagram approved by the client
• Inspection of the electrical network of the premises intended to host the implemented equipment
Result
• Commissioning works were completed, and the founders’ requirements were met as a result.
• Logical and physical network diagrams were prepared for the commissioned equipment.
• Based on the commissioning results, an equipment power-supply diagram was prepared.