Data-center construction and certification
Tasks
1. Building an effective public-administration system based on the use of information and telecommunications technologies
2. Building a regional information and communications infrastructure
3. Ensuring interaction with federal state information systems
4. Implementing and developing information systems that support operations
5. Ensuring comprehensive management of the implementation of information and communications technologies
Conditions
The need to create a data center to host key services. Protection of information in the data center.
Question
• Design of the data center and its internal infrastructure for hosting the required services
• Selection and configuration of equipment, design of a protection system, and preparation of the project in accordance with GOST
Solution
• Pre-design audit
• Data-center design
• Information-security assurance subsystem (ISAS) design
• Commissioning works
• Acceptance testing
• Data-center certification
Result
An audit was conducted, based on which a “roadmap” for building the data center was developed. The roadmap described the main steps and their sequence for creating the data center, and technical solutions were selected. Commissioning works were then completed. The next step was the design of the information-security assurance subsystem and its commissioning — acceptance. Certification is planned.